Prvi radni dan – Brušenje i kitanje, 4.3.2019.

Preparations, 20.11.2020

2. FESB Hydro tournament, 23.10.2019

Team Building NP Kornati, 11-12-13.10.2019.

Lunch, 9.10.2019.

to see gallery click on the title or picture

Testing

Testing – part two, 20.8.2019.

Testing – part one, 19.8.2019.

DIY battery pack, 16.7.2019.

Painting, 9.7.2019.

The final phase

Vacuum infusion, 11.6.2019

Preparation for vacuum infusion

5-10.6.2019

Brodosplit, 31.5.2019.

Workshop cleaning, 20.5.2019.

Making trolley, 5-15.5.2019.

Fixin mold, 10-30.4.2019.

Preparation of the female mold, 25-29.3.2019.

Mold extraction

Time Lapse of work

Laminating, 7.3.2019.

Surface preparation and cutting material, 7.3.2019.

Water grinding, 6.3.2019.

Grinding plaster, 5.3.2019.

First working day – Grinding and plastering, 4.3.2019.

FESB Hydro team – Official Teaser

Brodosplit, 24.1.2019

Close Menu